Aurora station opened on 16 May 1853, when steam train service began between Toronto and Machell's Corners, as Aurora was then known, on the Ontario, Simcoe and Huron Railway.[1] The first train was led by the Toronto, the first locomotive built in Canada, completed at the James Good foundry Toronto Locomotive Works on 16 April 1853.[2] The train consist included two boxcars carrying freight, one passenger coach car, and one mixed passenger and baggage car.[3] This first voyage is commemorated by a plaque installed in 1953 at Union Station in Toronto,[4] as well as a steam locomotive bell placed first at Centennial Park in May 1963, which has since been relocated to Aurora station. There is also a plaque placed in a small parkette at the station by the Board of Trade and another placed by the Province of Ontario to remember the event.[5]
The train's arrival at the Wellington Street train station was greeted with cheers from nearly all residents of the community, who had assembled at the station, and the event was celebrated with a fireworks display.[1] Connection to the railway led to prosperity for Aurora, with the development of two hotels, a wagon maker, a brewery, and other businesses.[1] In 1855 the line was completed to Collingwood.
The station building was renovated after GO Transit became the exclusive passenger carrier in 1992.
On August 21, 2012, GO Transit opened a new bus loop to accommodate all GO and York Region Transit bus service at the station.[8]
Services
As of January 2018, weekday train service operates approximately every 15–30 minutes in the morning peak period (southbound), every 30 minutes in the afternoon peak period (northbound) and every hour at other times. Outside of peak periods, most trains terminate at Aurora with connecting buses for stations further north.[9]
On weekends and holidays, service operates approximately every hour to and from Union Station, with most trains terminating at Aurora station. Three daily trains in each direction cover the full route from Barrie to Toronto, while the remainder have bus connections at Aurora station for stations further north.[9]
Connecting York Region Transit buses
32 Aurora South
33 Wellington–Leslie
54 Bayview
Mobility On-Request
Future
In August 2023, construction began on station improvements to support future all-day, two-way 15-minute service between Union Station and Aurora. The work includes: adding a second through-track with a new platform accessible via pedestrian tunnels, building a new passenger pick-up/drop-off area, adding a new exit at Berczy Street. The work is part of the province's GO Expansion project.[10]