Palermo Aeroporto railway station is situated underground, directly opposite the airport terminal, and is accessible through the terminal.
History
The station is part of the extension of Metropolitana di Palermo Line A from Piraineto railway station to the airport. The construction of this extension began in 2001, and the station was opened in 2004.
Features
The station is equipped with three platforms, all of them for passenger service.
Train movements
Palermo Aeroporto is now the northwestern terminus of Line A. Trains operate between Punta Raisi and Palermo Centrale. On weekdays, a train runs in each direction approximately every 30 minutes between early morning and around 10 pm.