Levelized cost of electricity

A line graph tracking the levelized cost of major electricity sources between 2009 and 2023 in dollars, according to data from Lazard. With time, the cost of renewable energies goes down significantly, most notably solar, for which the price goes from 359 dollars per megawatt-hour in 2009 to 60 dollars in 2023
Average unsubsidized levelized cost of energy. With increasingly widespread implementation of sustainable energy sources, costs for sustainable have declined, most notably for energy generated by solar panels. Data source is Lazard.[1]

The levelized cost of electricity (LCOE) is a measure of the average net present cost of electricity generation for a generator over its lifetime. It is used for investment planning and to compare different methods of electricity generation on a consistent basis.

The more general term levelized cost of energy may include the costs of either electricity or heat. The latter is also referred to as levelized cost of heat[2] or levelized cost of heating (LCOH), or levelized cost of thermal energy.

The LCOE "represents the average revenue per unit of electricity generated that would be required to recover the costs of building and operating a generating plant during an assumed financial life and duty cycle", and is calculated as the ratio between all the discounted costs over the lifetime of an electricity generating plant divided by a discounted sum of the actual energy amounts delivered.[3] Inputs to LCOE are chosen by the estimator. They can include the cost of capital, decommissioning, fuel costs, fixed and variable operations and maintenance costs, financing costs, and an assumed utilization rate.[4]

Definition

The cost of energy production depends on costs during the expected lifetime of the plant and the amount of energy it is expected to generate over its lifetime. The levelized cost of electricity (LCOE) is the average cost in currency per energy unit, for example, EUR per kilowatt-hour or AUD per megawatt-hour.[5] The LCOE is an estimation of the cost of production of energy, thus it tells nothing about the price for consumers and is most meaningful from the investor’s point of view.

The LCOE is calculated by adding up all costs of production, divided by the total amount of energy it is expected to generate. In formula:[6][7][8]

It : investment expenditures in the year t
Mt : operations and maintenance expenditures in the year t
Ft : fuel expenditures in the year t
Et : electrical energy generated in the year t
r : discount rate
n : expected lifetime of system or power station
Note: caution must be taken when using formulas for the levelized cost, as they often embody unseen assumptions, neglect effects like taxes, and may be specified in real or nominal levelized cost. For example, other versions of the above formula do not discount the electricity stream. The real lifetime may be considerably longer or shorter than expected.

Care should be taken in comparing different LCOE studies and the sources of the information as the LCOE for a given energy source is highly dependent on the assumptions, financing terms and technological deployment analyzed.[9] For any given electricity generation technology, LCOE varies significantly from region to region, depending on factors such as the cost of fuel or energy resources such as wind.[4]

Thus, a key requirement for the analysis is a clear statement of the applicability of the analysis based on justified assumptions.[9] In particular, for LCOE to be usable for rank-ordering energy-generation alternatives, caution must be taken to calculate it in "real" terms, i.e. including adjustment for expected inflation.[10][11]

Assumptions

Capacity factor

The assumption of the capacity factor has a significant impact on the calculation of LCOE as it determines the actual amount of energy produced by specific installed power. Formulas that output cost per unit of energy ($/MWh) already account for the capacity factor, while formulas that output cost per unit of power ($/MW) do not.[12]

Discount rate

Cost of capital expressed as the discount rate is one of the most controversial inputs into the LCOE equation, as it significantly impacts the outcome and a number of comparisons assume arbitrary discount rate values with little transparency of why a specific value was selected. Comparisons that assume public funding, subsidies, and social cost of capital tend to choose low discount rates (3%), while comparisons prepared by private investment banks tend to assume high discount rates (7–15%) associated with commercial for-profit funding.[citation needed] Assuming a low discount rate favours nuclear and sustainable energy projects, which require a high initial investment but then have low operational costs.

In a 2020 analysis by Lazard,[13] sensitivity to discount factor changes in the range of 6–16% results in different LCOE values but the identical ordering of different types of power plants if the discount rates are the same for all technologies.

Usage and limitations

LCOE is often cited as a convenient summary measure of the overall competitiveness of different generating technologies, however, it has potential limitations. Investment decisions consider the specific technological and regional characteristics of a project, which involve many other factors not reflected in some instances of LCOE.[4] One of the most important potential limitations of LCOE is that it may not control for time effects associated with matching electricity production to demand. This can happen at two levels:

  • Dispatchability, the ability of a generating system to come online, go offline, or ramp up or down, quickly as demand swings.
  • The extent to which the availability profile matches or conflicts with the market demand profile.[4]

In particular, if the costs of matching grid energy storage are not included in projects for variable renewable energy sources such as solar and wind, they may produce electricity when it is not needed in the grid without storage. The value of this electricity may be lower than if it was produced at another time, or even negative. At the same time, variable sources can be competitive if they are available to produce when demand and prices are highest, such as solar during summertime mid-day peaks seen in hot countries where air conditioning is a major consumer.[9]

To ensure enough electricity is always available to meet demand, storage or backup generation may be required, which adds costs that are not included in some instances of LCOE.[14] Excess generation when not needed may force curtailments, thus reducing the revenue of an energy provider. Decisions about investments in energy generation technologies may be guided by other measures such as the levelized cost of storage (LCOS) and the levelized avoided cost of energy (LACE), in addition to the LCOE.[4]

Another potential limitation of LCOE is that some analyses may not adequately consider the indirect costs of generation.[15] These can include the social cost of greenhouse gas emissions, other environmental externalities such as air pollution, or grid upgrade requirements.

The LCOE for a given generator tends to be inversely proportional to its capacity. For instance, larger power plants have a lower LCOE than smaller power plants. Therefore, making investment decisions based on insufficiently comprehensive LCOE can lead to a bias towards larger installations while overlooking opportunities for energy efficiency and conservation[16] unless their costs and effects are calculated, and included alongside LCOE numbers for other options such as generation infrastructure for comparison.[17] If this is omitted or incomplete, LCOE may not give a comprehensive picture of potential options available for meeting energy needs.

See also

References

  1. ^ "2023 Levelized Cost Of Energy+". Lazard. 12 April 2023. p. 9. Archived from the original on 27 August 2023. (Download link labeled "Lazard's LCOE+ (April 2023) (1) PDF—1MB")
  2. ^ A Comparative Cost Assessment of Energy Production from ... Nian, Energy Procedia, 2016
  3. ^ Lai, Chun Sing; McCulloch, Malcolm D. (March 2017). "Levelized cost of electricity for solar photovoltaic and electrical energy storage". Applied Energy. 190: 191–203. doi:10.1016/j.apenergy.2016.12.153. S2CID 113623853.
  4. ^ a b c d e U.S. Energy Information Administration (March 2022). "Levelized Costs of New Generation Resources in the Annual Energy Outlook 2022" (PDF).
  5. ^ K. Branker, M. J.M. Pathak, J. M. Pearce, doi:10.1016/j.rser.2011.07.104 A Review of Solar Photovoltaic Levelized Cost of Electricity, Renewable and Sustainable Energy Reviews 15, pp.4470–4482 (2011). Open access
  6. ^ Walter Short; Daniel J. Packey; Thomas Holt (March 1995). "A Manual for the Economic Evaluation of Energy Efficiency and Renewable Energy Technologies" (PDF). www.nrel.gov. National Renewable Energy Laboratory. pp. 47–50. Retrieved 17 July 2022.
  7. ^ Lai, Chun Sing; Locatelli, Giorgio; Pimm, Andrew; Tao, Yingshan; Li, Xuecong; Lai, Loi Lei (October 2019). "A financial model for lithium-ion storage in a photovoltaic and biogas energy system". Applied Energy. 251: 113179. doi:10.1016/j.apenergy.2019.04.175.
  8. ^ Lai, Chun Sing; Jia, Youwei; Xu, Zhao; Lai, Loi Lei; Li, Xuecong; Cao, Jun; McCulloch, Malcolm D. (December 2017). "Levelized cost of electricity for photovoltaic/biogas power plant hybrid system with electrical energy storage degradation costs". Energy Conversion and Management. 153: 34–47. doi:10.1016/j.enconman.2017.09.076.
  9. ^ a b c Branker, K.; Pathak, M.J.M.; Pearce, J.M. (2011). "A Review of Solar Photovoltaic Levelized Cost of Electricity". Renewable and Sustainable Energy Reviews. 15 (9): 4470–4482. doi:10.1016/j.rser.2011.07.104. hdl:1974/6879. S2CID 73523633. Open access
  10. ^ Loewen, James; Gagnon, Peter; Mai, Trieu. "A resolution to LCOE is not the metric you think it is". Utility Dive. Retrieved 7 October 2020.
  11. ^ Loewen, James (August–September 2020). "Correction to Electricity Journal papers in July 2019 issue and in July 2020 issue by James Loewen". The Electricity Journal. 33 (7): 106815. doi:10.1016/j.tej.2020.106815. S2CID 225344100. Retrieved 7 October 2020.
  12. ^ "Analysts' inaccurate cost estimates are creating a trillion-dollar bubble in conventional energy assets". Utility Dive. Retrieved 2021-04-08.
  13. ^ "Lazard's Levelized Cost of Energy Version 14.0" (PDF). Lazard.com. Lazard. 19 October 2020. Archived (PDF) from the original on 28 January 2021.
  14. ^ "Comparing the Costs of Intermittent and Dispatchable Electricity-Generating Technologies", by Paul Joskow, Massachusetts Institute of Technology, September 2011". Retrieved 2019-05-10.
  15. ^ Hwang, Sung-Hyun; Kim, Mun-Kyeom; Ryu, Ho-Sung (26 June 2019). "Real Levelized Cost of Energy with Indirect Costs and Market Value of Variable Renewables: A Study of the Korean Power Market". Energies. 12 (13): 2459. doi:10.3390/en12132459.
  16. ^ Bronski, Peter (29 May 2014). "You Down With LCOE? Maybe You, But Not Me:Leaving behind the limitations of levelized cost of energy for a better energy metric". RMI Outlet. Rocky Mountain Institute (RMI). Archived from the original on 28 October 2016. Retrieved 28 October 2016.
  17. ^ "Levelized Cost of Energy Analysis 9.0". 17 November 2015. Retrieved 24 October 2020.

Read other articles:

Famadihana adalah tradisi pemakaman di Madagaskar. Dikenal sebagai berubahnya tulang. Ritual ini dilakukan dengan mengeluarkan jasad leluhur berdasarkan silsilah keluarga, membungkusnya kembali dengan kain suci yang baru, lalu para pelayat berpesta dengan menari-nari disekitar jasad disertai iringan musik.[1] Sejarah Mayat dalam Famadihana Ritual ini merupakan jenis ritual yang baru ada. Pertama digelar sekitar abad ke-17. Budaya ini dipengaruhi oleh sistem upacara pemakaman ganda di Asi…

German federal law enforcement agency This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Federal Police Germany – news · newspapers · books · scholar · JSTOR (January 2013) (Learn how and when to remove this template message) Federal PoliceBundespolizeiLogo of the BPOLCommon nameFederal PoliceAbbreviatio…

Questa voce sull'argomento calciatori italiani è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Ernesto Bonino Nazionalità  Italia Calcio Ruolo Attaccante, centrocampista Termine carriera 1927 Carriera Squadre di club1 1920-1927 Libertas Lucca56+ (9) Nazionale 1921-1922 Italia2 (0) 1 I due numeri indicano le presenze e le reti segnate, per le sole partite di campionato.Il simbolo → indica un tr…

Peta menunjukan jaringan kereta api India. Transportasi rel umumnya digunakan untuk transportasi jarak jauh di India. Hampir seluruh pengoperasian kereta api di India ditangani oleh perusahaan negeri, Indian Railways, di bawah Departemen Kereta Api. Jalur ini dikatakan sebagai jaringan terbesar ke-2 di dunia. Sarana dan Prasarana Umumnya di India menggunakan rel berukuran 1,676 mm atau rel lebar, hal ini dikarenakan India merupakan salah satu negara dengan penduduk terbanyak di dunia sehing…

Pengakuan Iman Skotlandia PengarangJohn KnoxNegaraSkotlandiaBahasabahasa InggrisGenrePengakuan imanTanggal terbit1560TeksPengakuan Iman Skotlandia di Wikisource Pengakuan Iman Skotlandia (bahasa Inggris: Scots Confession atau Scottish Confession of Faith, Latin: Confessio Scoticana) adalah pengakuan iman yang ditulis pada tahun 1560 oleh enam pemimpin Reformasi Protestan di Skotlandia. Teks pengakuan iman adalah standar subordinat pertama untuk gereja Protestan di Skotlandia. Bersama dengan…

Université Visva-BharatiHistoireFondation 1921CadreType UniversitéPays  IndeCoordonnées 23° 40′ 44″ N, 87° 40′ 25″ EOrganisationFondateur Rabîndranâth TagoreAffiliation Commission des subventions aux universitésSite web visvabharati.ac.inmodifier - modifier le code - modifier Wikidata L'université Visva-Bharati est une université centrale de recherche et une institution d'importance nationale située à Santiniketan, au Bengale occidental, en …

Ne doit pas être confondu avec Souabe (dialecte), Sora-be ou Serbe. Sorabe Date de création VIe siècle Pays Allemagne Région Lusace Nombre de locuteurs 40 000 Nom des locuteurs sorabophones Classification par famille - langues indo-européennes - langues balto-slaves - langues slaves - langues slaves occidentales - sorabe Codes de langue IETF wen ISO 639-2 wen ISO 639-3 wen ISO 639-5 wen Glottolog sorb1249 modifier  Le sorabe (autonyme : Serbšćina, en allemand : So…

2010 puzzle adventure video game 2010 video gameGhost Trick: Phantom DetectiveDeveloper(s)CapcomPublisher(s)CapcomDirector(s)Shu Takumi Atsushi Maruyama[a]Producer(s)Hironobu Takeshita Shingo Izumi[b]Designer(s)Shu TakumiProgrammer(s)Toshihiko HondaArtist(s)Koki KinoshitaWriter(s)Shu TakumiComposer(s)Masakazu SugimoriYasumasa Kitagawa[c]EngineRE Engine[d]Platform(s)Nintendo DSiOSAndroidNintendo SwitchPlayStation 4WindowsXbox OneRelease June 19, 2010 Nintendo DSJP:…

Pour les articles homonymes, voir GBM. Grand Besançon Métropole Administration Pays France Région Bourgogne-Franche-Comté Département Doubs Forme Communauté urbaine Siège La City4, rue Gabriel-PlançonBesançon Communes 68 Présidente Anne Vignot Budget 360 900 000 € (2023) Date de création 5 juillet 1993 Code SIREN 242500361 Démographie Population 197 494 hab. (2021 ) Densité 374 hab./km2 Géographie Superficie 528,60 km2 Localisation Situation dan…

برنارد إم. أوليفر (بالإنجليزية: Bernard More Oliver)‏  معلومات شخصية الميلاد 17 مايو 1916  الوفاة 23 نوفمبر 1995 (79 سنة)   لوس ألتوس هيلس  مواطنة الولايات المتحدة  عضو في الأكاديمية الوطنية للعلوم  الحياة العملية المدرسة الأم جامعة ستانفورد  مشرف الدكتوراه فريدريك تيرمان…

Bandar Udara Frans Xavier SedaFrans Xavier Seda AirportIATA: MOFICAO: WATCInformasiJenisPublikPemilikPemerintah IndonesiaPengelolaKementerian PerhubunganMelayaniMaumereLokasiMaumere, Kabupaten Sikka, Nusa Tenggara Timur, IndonesiaKetinggian dpl35 mdplKoordinat08°38′27.08″S 122°14′12.56″E / 8.6408556°S 122.2368222°E / -8.6408556; 122.2368222Koordinat: 08°38′27.08″S 122°14′12.56″E / 8.6408556°S 122.2368222°E / -8.640…

RevelationsEpisode The X-FilesNomor episodeMusim 3Episode 11SutradaraDavid NutterPenulisKim NewtonKode produksi3X11Tanggal siar15 Desember 1995Durasi44 menitBintang tamu Kevin Zegers sebagai Kevin Kryder Sam Bottoms sebagai Michael Kryder Kenneth Welsh sebagai Simon Gates Michael Berryman sebagai Owen Jarvis Hayley Tyson sebagai Susan Kryder R. Lee Ermey sebagai Pendeta Patrick Findley[1] Kronologi episode ← Sebelumnya731 Selanjutnya →War of the Coprophages Revelations…

No.5Album studio karya 2PMDirilis15 Juni 2015Direkam2015Genre K-pop R&B Durasi42:31BahasaKoreaLabelJYP EntertainmentKronologi 2PM 2PM of 2PM (2015)2PM of 2PM2015 No.5(2015) Galaxy of 2PM (2016)Galaxy of 2PM2016 Singel dalam album No.5 My HouseDirilis: 15 Juni 2015 No.5 (ditulis juga sebagai №5) adalah album studio berbahasa Korea kelima (kesembilan secara keseluruhan) oleh boy band Korea Selatan 2PM. Album ini dirilis baik dalam bentuk fisik maupun format digital pada tanggal 15 Juni 2…

Untuk orang lain dengan nama sama, lihat James Black. Biografi ini tidak memiliki sumber tepercaya sehingga isinya tidak dapat dipastikan. Bantu memperbaiki artikel ini dengan menambahkan sumber tepercaya. Materi kontroversial atau trivial yang sumbernya tidak memadai atau tidak bisa dipercaya harus segera dihapus.Cari sumber: James Whyte Black – berita · surat kabar · buku · cendekiawan · JSTOR (Pelajari cara dan kapan saatnya untuk menghapus pesan templ…

Swiss footballer and manager (born 1959) Urs Schönenberger Personal informationFull name Urs SchönenbergerDate of birth (1959-02-21) 21 February 1959 (age 65)Place of birth Zürich, SwitzerlandHeight 1.93 m (6 ft 4 in)Senior career*Years Team Apps (Gls)1980–1986 FC Zürich 1986–1987 AC Bellinzona 1987–1994 FC Luzern 1994–1996 SC Kriens 1996–1998 FC Baden Managerial career1998–2001 FC Zürich (assistant)2001–2002 FC Winterthur2002–2003 SC Kriens2003 FC Luzern…

Pour les articles homonymes, voir Fanfani. Amintore Fanfani Amintore Fanfani en 1983. Fonctions Sénateur à vie italien 10 mars 1972 – 20 novembre 1999(27 ans, 8 mois et 10 jours) Législature Ve, VIe, VIIe, VIIIe, IXe, Xe, XIe, XIIe et XIIIe Groupe politique DC (jusqu'en 1994)PPI (à partir de 1994) Président du Conseil des ministres italien 18 avril – 29 juillet 1987(3 mois et 12 jours) Président Francesco Cossiga Gouvernement Fanfani VI Législature IXe Coaliti…

Painting by Sidney Nolan The TrialArtistSidney NolanYear1947TypeEnamel paint on Composition boardDimensions90.7 cm × 121.2 cm (30 in × 34 in)LocationNational Gallery of Australia, Canberra The Trial (1947) is a painting by the Australian painter Sidney Nolan. This painting depicts Ned Kelly's trial, where Kelly is depicted in handcuffs. A judge and several people look at him in the court. The painting is one of a number by Nolan to use enamel paint, us…

Computer animation technique This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Skeletal animation – news · newspapers · books · scholar · JSTOR (December 2007) (Learn how and when to remove this message) Bones (in green) used to pose a hand. In practice, the bones themselves are often hidden and replaced by more …

Disambiguazione – Se stai cercando altri significati, vedi Ignazio La Russa (disambigua). Ignazio La RussaIgnazio La Russa nel 2023 Presidente del Senato della RepubblicaIn caricaInizio mandato13 ottobre 2022 PredecessoreMaria Elisabetta Alberti Casellati Vicepresidente del Senato della RepubblicaDurata mandato28 marzo 2018 –12 ottobre 2022 PresidenteMaria Elisabetta Alberti Casellati Presidente di Fratelli d'ItaliaDurata mandato4 aprile 2013 –8 marzo 2014 …

この項目には、一部のコンピュータや閲覧ソフトで表示できない文字が含まれています(詳細)。 数字の大字(だいじ)は、漢数字の一種。通常用いる単純な字形の漢数字(小字)の代わりに同じ音の別の漢字を用いるものである。 概要 壱万円日本銀行券(「壱」が大字) 弐千円日本銀行券(「弐」が大字) 漢数字には「一」「二」「三」と続く小字と、「壱」「弐」…

Kembali kehalaman sebelumnya