Pink Line (Namma Metro)

Pink Line
Overview
Other name(s)Namma Metro
Native nameNamma Metro
StatusUnder Construction
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
Stations18
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
Depot(s)Kothanur
History
Planned openingPhase 1 - September 2025; 11 months' time (September 2025) [1]
Phase 2 - June 2026; 20 months' time (June 2026)
Technical
Line length21.25 km (13.20 mi)
Number of tracks2
CharacterElevated, At Grade and Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Pink Line Map (TBC)

Nagawara
Blue Line
Under Construction
Kadugundanahalli
Venkateshpura
Tannery Road
Pottery Town Bangalore East railway station
Cantonment Railway Station Bangalore Cantonment railway station
Shivaji Nagar
Mahatma Gandhi Road
National Military School
Langford Town
Lakkasandra
Dairy Circle
Tavarekere
Jayadeva Hospital
Yellow Line
Under Construction
JP Nagar 4th Phase
Orange Line
Planned
IIMB
Hulimavu
Mainline rail interchange Kothanur Depot (U/C)
Kalena Agrahara

The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 21.25 km (13.20 mi) line connects Kalena Agrahara station (previously named Gottigere) on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north. The Pink Line is mostly underground (13.92 km (8.65 mi)) but also has a 6.98 km (4.34 mi) elevated section and a 0.48 km (0.30 mi) at-grade (surface) section. There are 18 stations on the line, including 12 underground and 6 elevated ones.[2] Pink Line will have an interchange with the Purple Line at MG Road station. It will also have interchanges with the Yellow line at Jayadeva Hospital station and with the Blue Line at Nagawara. Both these lines are under construction.[3][4]

The entire line is planned to open in two phases where the first phase, covering a total distance of 7.5km stretch (Kalena Agrahara - Tavarekere), is expected to be operational around September 2025, whereas the second phase, covering the remaining distance of 13.8km stretch (Dairy Circle - Nagawara) is expected to be operational around June 2026 (along with Phase 2A of Blue Line). [5][6]

History

In 2007, as follow up to the Metro Phase that was about to begin construction then, RITES had recommended several mono-rail routes totaling 60 km (37 mi). These recommendations were made as Government of Karnataka requested a survey of feeder routes for Phase l of metro that was to begin construction. One of the routes was entirely on Bannerghatta Road from Bannerghatta National Park up to its northern end at Hosur Road (near Adugodi).[7] At that stage, Bannerghatta Road was not expected to have high growth and dense population, hence the recommendation for Monorail. However, by 2010 itself, it became apparent that Bannerghatta Road would need a higher capacity system than a monorail. Also, Karnataka government did not favor a monorail system and preferred expansion of the Metro system. Accordingly, for its Phase ll, BMRC had requested DMRC for a DPR for the route between[8] Bannerghatta to Yelahanka via:

  • Jayadeva Underpass, Hosur Road, Brigade Road, MG Road,
  • Kamaraj Road, Tannery Road, Nagavara Junction (along Outer Ring Road), Sahakara Nagar, Vidyaranyapura to Yelahanka.
  • Jayamahal Extension, RT Nagar, Nagavara Junction (along Outer Ring Road), Sahakara Nagar to Yelahanka.

The DPR had noted that the Metro Alignment may have to go underground after Jayadeva flyover (along Bannerghatta Road) up to Nagawara junction (along Outer Ring Road). The remaining portion could be elevated.

Planning

Since there were plans for a line along Outer Ring Road and also the possibility that a link to Airport may have to be routed along Airport Road (passing Yelahanka), BMRC opted to terminate the Pink Line in Phase ll at Nagawara.

Land requirement was estimated at 50 hectares (120 acres) and Karnataka Industrial Area Development Board (KIADB) was tasked with acquiring land on behalf of BMRC. A total of 690 trees were to be cut to build the line (438 trees for the elevated section and 252 trees for the underground stretch).[9]

On 14 July 2017, BMRC unveiled the alignment of the 13.92 km (8.65 mi) underground section of the line. The alignment included a modification from the original plan - Cantonment metro station had been proposed to be constructed on Indian Railways land next to Cantonment railway station. Due to technicalities (steep gradient between Shivajinagar and Cantonment, sharp curve past the old location of Cantonment Station, construction below built-up structures, difficulty acquiring land and very high costs of demolishing several properties in the area), BMRC opted to shift Cantonment Metro Station.[10] Cantonment Metro Station would instead be built under a playground belonging to Bruhat Bengaluru Mahanagara Palike (BBMP), near Bamboo Bazaar.[3][11][12]

This was resented by sections of the public as the new location would be further away from the entrance of Cantonment station. SWR is however planning new suburban platforms on railways land that is towards the Metro station. A skywalk or pedestrian subway is being planned to connect the Metro station to Cantonment Railway Station.[13]

The MG Road station on the Pink Line is to be located under Kamaraj Road and will serve as an interchange station with the Purple Line.[3]

Tendering

Due to long underground section with tunneling in difficult geology, the cost of the Pink Line was expected to be high. Total cost estimates for the line were 11,014 crore (US$1.3 billion) in March 2017 (most expensive line in Phase ll).[14][15] BMRC initially floated tenders for the construction of the 13.9 km (8.6 mi) underground section in four packages during June 2017. However, all bids received were too high (nearly 70% higher).[16][17]

Initial

Tendering

Estimated

by BMRC

Bids Received (₹ /crores)
L&T ITD-Cem Afcons Gülermak
Package-1 1268.90 2337.93 2223.40^ 2311.34
Package-2 1325.97 2333.71 2349.70 2311.11 2219.86^
Package-3 1334.83 2237.58^ 2373.35 2361.32 2341.32
Package-4 1117.86 1872.47^ 2010.95 1994.41
Total 5047.56 4571.29* 8933.45 8906.78 8866.93
*L&T bid for only two packages; ^Lowest Bid.

Since bids were too high, all tenders for the underground section had been canceled by BMRC on 26 March 2018. There was speculation of collusion as bids were similar and each bidder had quoted lowest for one package, thus all four might get to be awarded one package each.

The second round of tendering resulted in bids that were closer to estimates by BMRC and were awarded to three firms during February–November period, 2019. One of the firms (L&T) won two bids.[18] The total awarded tunneling tenders for the underground sections was ₹5,925.95 crores (appx US$812 million).

Pink Line
Tendering Section Length Successful Bid /Cost Contractor Award
Reach 6 Elevated Kalena Agrahara - Dairy Circle 7.50 km (4.66 mi) 364.87 crore (US$44 million) GR Infraprojects 03 Aug 2021
Reach 6 UG Pkg-1 Dairy Circle - Langford Town 3.65 km (2.27 mi) ₹1,526.33 crore (US$218 million) Afcons 06 Nov 2019
Reach 6 UG Pkg-2 Rashtriya Military School - Shivajinagar 2.76 km (1.71 mi) 1,329.14 crore (US$160 million) Larsen & Toubro 28 Feb 2019
Reach 6 UG Pkg-3 Shivajinagar - Tannery Road 2.88 km (1.79 mi) 1,299.23 crore (US$160 million) Larsen & Toubro 28 Feb 2019
Reach 6 UG Pkg-4 Tannery Road - Nagawara North Ramp 4.59 km (2.85 mi) ₹1,771.25 crore (US$253 million) ITD-Cem 06 Nov 2019
Kothanur Depot 150.83 crore (US$18 million) ISGEC Heavy Engineering 09 July 2020
Rolling Stock (96 Coaches) 959.04 crore (US$110 million) BEML 08 Aug 2023
Total 21.25 km (13.20 mi) 7,400.69 crore (US$890 million)

Construction

Elevated Section

In March 2017, BMRC had floated tender for construction of the 7.5 km (4.7 mi) elevated section between Kalena Agrahara (previously Gottigere) and Tavarekere (previously Swagat Cross) stations for construction of the elevated section of Pink Line with viaduct, five stations and depot entry line to Kothanur depot.[19][20] The tender was awarded to Simplex Constructions for 578.70 crores on 8 September 2017.[21]

Due to very slow progress by Simplex, their tender was canceled and a fresh tender was called for the remaining works in February 2021. GR Infra was the lowest bidder and the tender was awarded to them in July, 2021.

Underground Section

Pre-tunneling construction work and piling for stations began in May 2019 by L&T. Tunnel boring using TBMs began in August–September 2020 by L&T with two TBMs. L&T uses four TBMs named Urja, Avni, Vindhya and Lavi. Two TBMs (Avni and Lavi) are used for tunnel boring southwards from Shivajinagar towards Rashtriya Military School. The other two TBMs (Urja and Vindhya) are used for boring southwards from Cantonment to Shivajinagar after which they will be shifted back to Cantonment to bore tunnels northwards towards Tannery road.

Tunnel boring work by Afcons with three TBMs (Varada, Rudra and Vamika) on the section between Rashtriya Military School and Dairy Circle began during March–June 2021 period.

ITD-Cem began tunnel works during June–August 2021 period on the Venkateshpura-Nagawara section.

The underground part of the Pink Line in Namma Metro is almost finished, with 95% completion between Tannery Road and Nagawara that stretches 13.76kms between two underground points. As per latest updates from the BMRCL officials, the elevated section is expected to be operational by September 2025, whereas the underground section is expected to be operational by June 2026. [22][23]

Funding

In May 2017, BMRC received in-principle approval from the European Investment Bank (EIB) to fund construction of the Kalena Agrahara-Nagawara line through a 3,700 crore (US$440 million) loan.[24] The BMRC secured an agreement with the Asian Infrastructure Investment Bank (AIIB) on 4 June 2019 to receive a soft loan of 2,255.14 crore (US$270 million) to be repaid over a period of 25 years.[25] The line will also be funded by the Central and State Governments.[26]

Stations

The line will have a total of 18 stations. The northern end of the line, which is underground, has 12 underground stations and the southern end, which is elevated, has 6 elevated stations.

Interchanges

Passenger interchange facilities, connecting to other metro and railway lines, will be provided at the following stations:

Pink Line
# Station Name Opening[27] Connections Station Layout Platform Level Type
English Kannada
1 Nagawara ನಾಗವಾರ Estimated June 2026 Blue Line (Under Construction) Underground Island & Side
2 Kadugundanahalli ಕಾಡುಗುಂಡನಹಳ್ಳಿ Estimated June 2026 Underground Island
3 Venkateshpura ವೆಂಕಟೇಶಪುರ Estimated June 2026 Underground Island
4 Tannery Road ಟ್ಯಾನರಿ ರಸ್ತೆ Estimated June 2026 Underground Island
5 Pottery Town ಪಾಟರಿ ಪಟ್ಟಣ Estimated June 2026 Underground Island
6 Cantonment Railway Station ದಂಡು ರೈಲ್ವೇ ನಿಲ್ದಾಣ Estimated June 2026 Mainline rail interchange Bengaluru Cantonment Underground Island
7 Shivajinagara ಶಿವಾಜಿನಗರ Estimated June 2026 Underground Island
8 Mahatma Gandhi Road ಮಹಾತ್ಮಾ ಗಾಂಧಿ ರಸ್ತೆ Estimated June 2026 Purple Line Underground Island & Side
9 National Military School ರಾಷ್ಟ್ರೀಯ ಸ್ಯೆನಿಕ ಶಾಲೆ Estimated June 2026 Underground Island
10 Langford Town ಲಾಂಗ್ಫೋರ್ಡ್ ಪಟ್ಟಣ Estimated June 2026 Underground Island
11 Lakkasandra ಲಕ್ಕಸಂದ್ರ Estimated June 2026 Underground Island
12 Dairy Circle ಹೈನುಗಾರಿಕೆ ವೃತ್ತ Estimated June 2026 Red Line (Proposed) Underground Island
13 Tavarekere ತಾವರೆಕೆರೆ Estimated September 2025 Elevated Side
14 Jayadeva Hospital ಜಯದೇವ ಆಸ್ಪತ್ರೆ Estimated September 2025 Yellow Line (Under Construction) Elevated Side
15 JP Nagar 4th Phase ಜಯಪ್ರಕಾಶ ನಗರ 4ನೇ ಹಂತ Estimated September 2025 Orange Line (Proposed) Elevated Side
16 IIMB ಐಐಎಂಬಿ Estimated September 2025 Elevated Side
17 Hulimavu ಹುಳಿಮಾವು Estimated September 2025 Elevated Side
18 Kalena Agrahara ಕಾಳೇನ ಅಗ್ರಹಾರ Estimated September 2025 Elevated Side

See also

References

  1. ^ Mathew Philip, Christin (16 February 2023). "72% Namma Metro tunnelling work over in Bengaluru; Pink Line to be commissioned in March 2025". Times of India.
  2. ^ bmrc.co.in/pdf/phase2/phase2forweb.pdf
  3. ^ a b c "Know the location of new Pink Line metro stations". The Hindu. 15 July 2017. Retrieved 22 July 2017.
  4. ^ "Bengaluru: Namma Metro Pink Line Tunnel Work To Complete By August". News18. 9 April 2024. Retrieved 9 April 2024.
  5. ^ Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN 0971-751X. Retrieved 7 August 2024. {{cite news}}: |last= has generic name (help)
  6. ^ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  7. ^ "Bangalore Monorail | Bangalore High Speed Rail". Karnataka.com. 29 October 2010. Retrieved 8 September 2020.
  8. ^ "DPR Phase-2" (PDF).
  9. ^ Menezes, Naveen (6 July 2017). "Civic work to start in a year: Metro Phase II boasts of most expensive underground line". The Economic Times. Retrieved 22 July 2017.
  10. ^ "BMRCL justifies not constructing metro station near Cantonment railway station, face public ire". Asianet News Network Pvt Ltd. Retrieved 9 September 2020.
  11. ^ "Metro: New alignment for longest underground stretch". The New Indian Express. 15 July 2017. Retrieved 22 July 2017.
  12. ^ "Location of proposed Cantt Metro station moved by 300 metres". Deccan Herald. Retrieved 22 July 2017.
  13. ^ "Bengaluru Cantonment to be suburban rail terminal". Deccan Herald. 11 May 2019. Retrieved 9 September 2020.
  14. ^ Menezes, Naveen (15 March 2017). "Gottigere-Nagawara Metro line estimated to cost Rs 11,014 crore". The Economic Times. Retrieved 16 March 2017.
  15. ^ "BMRCL to construct a 11,014 Cr metro line in Bengaluru". Dalal Street Investment Journal. Retrieved 16 March 2017.
  16. ^ "Bangalore Metro bids for Phase II". www.tunneltalk.com. Retrieved 8 September 2020.
  17. ^ Menezes, Naveen. "High cost forces BMRCL to cancel underground tenders". The Economic Times. Retrieved 8 September 2020.
  18. ^ "Bangalore Metro Phase II moves ahead". www.tunneltalk.com. Retrieved 8 September 2020.
  19. ^ "Tenders called for Metro phase 2 stations". Deccan Herald. Retrieved 7 March 2017.
  20. ^ "Dairy Circle to Nagawara metro link announced, but it won't be quick – Bangalore Mirror -". Bangalore Mirror. Retrieved 7 March 2017.
  21. ^ "Simplex Infrastructures emerge L1 Bidder in tender for Metro Rail stretch on Bannerghatta Road – RailNews Media India Ltd". Retrieved 8 September 2020.
  22. ^ Bureau, The Hindu (28 April 2024). "Namma Metro: Underground tunnel work on Pink Line 95% complete". The Hindu. ISSN 0971-751X. Retrieved 29 April 2024. {{cite news}}: |last= has generic name (help)
  23. ^ Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN 0971-751X. Retrieved 7 August 2024. {{cite news}}: |last= has generic name (help)
  24. ^ "Rs 3,700-cr loan likely for Nagawara-Gottigere line". Deccan Herald. Retrieved 11 May 2017.
  25. ^ "Rs 2K cr boost for Phase-II BMRCL underground network". The New Indian Express. 5 June 2019. Retrieved 6 June 2019.
  26. ^ Briginshaw, David. "India seeks EIB loan for Bangalore metro Line 4". International Rail Journal. Retrieved 2 March 2017.
  27. ^ "Bengaluru Metro's Pink Line to be operational in two phases".

Read other articles:

Federal region of Belgium, including the City of Brussels This article is about the Brussels-Capital Region. For the municipality within it, which is the de jure national capital, see City of Brussels. For other places, see Brussels (disambiguation). Region in BelgiumBrussels Bruxelles (French)Brussel (Dutch)RegionBrussels-Capital RegionRégion de Bruxelles-Capitale (French)Brussels Hoofdstedelijk Gewest (Dutch)A collage with several views of Brussels, Top: Northern Quarter b…

Daftar denominasi Kristen (atau denominasi yang menganggap diri sebagai Kristen) disusun berdasarkan hubungan-hubungan historis dan doktriner. (Lihat pula: agama Kristen; denominasi Kristen). Rumpun-Rumpun Utama Denominasi Kristen: Kotak ini: lihatbicarasunting Gereja Barat Gereja Timur Protestantisme Anabaptis Anglikan Kalvinis Lutheran (Gereja Latin) Gereja Katolik (Gereja-Gereja Katolik Timur) Gereja Ortodoks Timur Gereja Ortodoks Oriental Gereja di Timur Nestorianisme Skisma (tahun 1552) Ger…

This article is about the history of tropical cyclone naming. For the current and future tropical cyclone lists, see Tropical cyclone naming. For previously used names, see List of historical tropical cyclone names. Part of a series onTropical cyclones Structure Central dense overcast Development Eye Effects By Region Warnings and watches Storm surge Preparedness Response Climatology and tracking Basins Climate change effects RSMCs Scales Observation Forecasting Rainfall forecasting Rainfall cli…

14th State Affairs Commission← 13th15th →Emblem of the SAC Chairman12 April 2019 – Incumbent(4 years, 351 days)OverviewTypeState Affairs CommissionElection1st Session of the 14th Supreme People's AssemblyLeadershipChairmanKim Jong UnFirst Vice ChairmenChoe Ryong-haeVice ChairmenPak Pong-juMembersTotal19 Politics of North Korea Constitution Juche  (state ideology) Songun  (military-first policy) Eternal leaders Kim Il Sung Kim J…

يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (ديسمبر 2018) تونس خلال الحرب العالمية الأولى جزء من الحرب العالمية الأولى العلم المشترك بين الزواوين والقناصة التونسي…

Penyuntingan Artikel oleh pengguna baru atau anonim untuk saat ini tidak diizinkan.Lihat kebijakan pelindungan dan log pelindungan untuk informasi selengkapnya. Jika Anda tidak dapat menyunting Artikel ini dan Anda ingin melakukannya, Anda dapat memohon permintaan penyuntingan, diskusikan perubahan yang ingin dilakukan di halaman pembicaraan, memohon untuk melepaskan pelindungan, masuk, atau buatlah sebuah akun. Untuk kegunaan lain, lihat Dadu (disambiguasi). Dua buah dadu bersisi enam dengan su…

Disambiguazione – Se stai cercando la forma di riproduzione asessuata per segmentazione trasversale del corpo, vedi Strobilazione. Questa voce o sezione sull'argomento anatomia vegetale non cita le fonti necessarie o quelle presenti sono insufficienti. Puoi migliorare questa voce aggiungendo citazioni da fonti attendibili secondo le linee guida sull'uso delle fonti. Strobilo di Pinus nigra Strobilo di Dioon edule Cippo sormontato da una pigna, che simboleggia l'albero della vita Lo stròb…

Virginia RappeVirginia Rappe c. 1920LahirVirginia Caroline Rappe(1891-07-07)7 Juli 1891[1]Chicago, Illinois, Amerika SerikatMeninggal9 September 1921(1921-09-09) (umur 30)San Francisco, California, Amerika SerikatMakamHollywood Forever CemeteryNama lainVirginia RappaeTahun aktif1909–1921PasanganRobert Moscovitz (1916–1916, kematiannya)Henry Lehrman (1919–1921) Virginia Caroline Rappe (/rəˈpeɪ/; 7 Juli 1891 – 9 September 1921)[2] adalah seor…

Allan LichtmanLahirAllan Jay Lichtman4 April 1947 (umur 77) Brooklyn, New York, Amerika SerikatKebangsaan Amerika SerikatAlmamaterUniversitas HarvardUniversitas Brandeis Allan Jay Lichtman (/ˈlɪktmən/; lahir 4 April 1947) adalah sejarawan politik asal Amerika Serikat yang mengajar di American University di Washington, D.C. sejak 1973. Lichtman adalah pencetus model The Keys to the White House (Indonesia: Kunci Menuju Gedung Putihcode: id is deprecated ), bersama dengan seismolog Rus…

28th season in existence of Manchester United Manchester United 1909–10 football seasonManchester United1909–10 seasonChairmanJohn Henry DaviesManagerErnest MangnallFirst Division5thFA CupFirst RoundTop goalscorerLeague: George Wall (14)All: George Wall (14)Highest home attendance50,000 vs Bristol City (25 March 1910)Lowest home attendance5,500 vs Everton (6 April 1910)Average home league attendance19,447 Home colours Away colours Third colours ← 1908–091910–11 → Th…

Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Januari 2023. SD Budhaya II Santo AgustinusSekolah Dasar Budhaya II Santo AgustinusInformasiJenisSwastaNomor Statistik Sekolah20109124Nomor Pokok Sekolah Nasional100105135Jumlah siswa533 2010StatusAktifAlamatLokasiJl. Perumnas Raya Buaran, Duren Sawit, Jakarta Tim…

Part of a series onMTV MTV channels MTV MTV2 Classic Tres MTV Live MTVU CMT Programs on MTV MTV personalities Censorship on MTV MTV Generation MTV News vte This is a list of television programs broadcast by VH1 Europe in Europe. Last programming Music series VH1 Shuffle (2012–2021) Guess The Year (2014–2021) Top 50 (2014-2021) Hits Don't Lie (2015-2021) We Love The: 00's (2015–2021) Artist: The Hits (2019-2021) Songs of the Century (2020-2021) 00s Power Ballads! (2021) Class of 2000-2009 (…

Jean-Paul Boëtius Boëtius con il Magonza nel 2020 Nazionalità  Paesi Bassi Altezza 178 cm Peso 67 kg Calcio Ruolo Ala Squadra svincolato Carriera Giovanili 2000-2012 Feyenoord Squadre di club1 2012-2015 Feyenoord80 (18)[1]2015-2017 Basilea14 (3)2017→  Genk6 (0)[2]2017-2018 Feyenoord29 (6)2018-2022 Magonza122 (12)2022-2023 Hertha Berlino21 (0) Nazionale 2010-2011 Paesi Bassi U-176 (1)2011 Paesi Bassi U-194 (1)2013-2016 Paesi Bassi U-211…

Voce principale: Kieler Sportvereinigung Holstein von 1900. Kieler Sportvereinigung Holstein von 1900Stagione 2004-2005Sport calcio Squadra Holstein Kiel Allenatore Frank Neubarth All. in seconda Volker Manz Regionalliga nord10° posto Maggiori presenzeCampionato: Sandmann, Hansen, Tornieporth (34)Totale: Sandmann, Hansen, Tornieporth (34) Miglior marcatoreCampionato: Dobrý (8)Totale: Dobrý (8) StadioHolstein-Stadion Maggior numero di spettatori7 300 vs. St. Pauli Minor numero di spe…

RobinDick Grayson sebagai Robin. Seni oleh Mikel Janín.PenerbitDC ComicsPenampilan pertamaDetective Comics #38 (April 1940)Dibuat olehBill FingerBob Kane Jerry RobinsonKarakter Daftar Dick GraysonJason ToddTim DrakeStephanie BrownDamian Wayne RobinSampul Robin vol. 2, #1 (November 1993)menampilkan versi Tim Drake dari karakter.Seni oleh Tom Grummett dan Scott Hanna.Informasi publikasi seriPenerbitDC ComicsJadwal Daftar (vol 1, Robin II, vol 2): Monthly(Robin III: Cry of the Huntress): Bi-Weekly…

† Человек прямоходящий Научная классификация Домен:ЭукариотыЦарство:ЖивотныеПодцарство:ЭуметазоиБез ранга:Двусторонне-симметричныеБез ранга:ВторичноротыеТип:ХордовыеПодтип:ПозвоночныеИнфратип:ЧелюстноротыеНадкласс:ЧетвероногиеКлада:АмниотыКлада:СинапсидыКл…

Julie Christie nel film Il dottor Živago (1965) Oscar alla miglior attrice 1966 Julie Frances Christie (Chabua, 14 aprile 1940) è un'attrice britannica. Tra le migliori attrici della sua generazione, ha vinto il Premio Oscar come miglior attrice protagonista nel 1966 per il film Darling. È stata candidata allo stesso premio altre tre volte per I compari (1971), Afterglow (1997) e Away from Her - Lontano da lei (2006). Ha inoltre vinto un Golden Globe, a fronte di 3 candidature, un Critics' Ch…

Questa voce sull'argomento università della Germania è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Università di Jena(DE) Friedrich-Schiller-Universität Jena UbicazioneStato Germania CittàJena Dati generaliNome latinoSalana Jenensis, Alma Mater Jenensis SoprannomeFriedrich-Schiller-Universität Jena MottoLIGHT, LIFE, LIBERTY – connecting visions Fondazione1558 FondatoreGiovanni Federico II di Sassonia Tipostatale FacoltàTeologia, g…

At the beginning of World War II, the Royal Navy was the strongest navy in the world,[1] with the largest number of warships built and with naval bases across the globe.[2] It had over 15 battleships and battlecruisers, 7 aircraft carriers, 66 cruisers, 164 destroyers and 66 submarines.[2] With a massive merchant navy, about a third of the world total, it also dominated shipping. The Royal Navy fought in every theatre from the Atlantic, Mediterranean, freezing Northern ro…

2010 book by Peter Lerangis This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: The Viper's Nest – news · newspapers · books · scholar · JSTOR (April 2010) (Learn how and when to remove this message) The Viper's Nest The Viper's NestAuthorPeter LerangisCountryUnited StatesUKCanadaLanguageEnglishSeriesThe 39 CluesGe…

Kembali kehalaman sebelumnya