The airport was then upgraded to accommodate airline service, with four check-in desks, two boarding areas, and new luggage belts and waiting rooms being constructed. The runway has a VOR system and a lighting system. The runway's length was extended to 1,654 m (5,427 ft), and in 2011 a project was proposed for the extension of the runway up to 2,020 m (6,630 ft) and for the creation of new infrastructure and other improvements. The airport was subsequently closed in 2016.
Service resumption
In July 2024, the airport will resume scheduled passenger flights. easyJet and Volotea have already announced they will serve the airport with new domestic and international routes. To accommodate large passenger aircraft, the runway has been extended to 2,000 metres (6,560 ft). In 2025, the construction of a new terminal is planned, along with a runway extension to 2,200 m (7,220 ft), the creation of more parking space and the construction of a new general aviation terminal. The airport is supposed to be in full operation in 2026 or 2027.[4] The new terminal, designed by Deerns Group, will have 5 gates (no jetbridges). Its design will let light pass through, creating an open space. It will also have photovoltaic panels on its roof to power the airport and will be built using entirely sustainable materials. The airport will have 8 parking spaces for aircraft and a plaza at the terminal's entrance.
Airlines and destinations
The following airlines operate regular scheduled services at Salerno: